Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Proposal on how to proceed with Verification and Validation of radiation shielding analyses

Okumura, Keisuke; Sakamoto, Yukio*; Tsukiyama, Toshihisa*

Shahei Kaiseki No V&V Gaidorain Sakutei Ni Mukete, p.4 - 8, 2023/03

no abstracts in English

JAEA Reports

Radiation shielding analysis of the upper structure of an accelerator-driven system

Iwamoto, Hiroki; Meigo, Shinichiro; Nakano, Keita; Yee-Rendon, B.; Katano, Ryota; Sugawara, Takanori; Nishihara, Kenji; Sasa, Toshinobu; Maekawa, Fujio

JAEA-Research 2021-012, 58 Pages, 2022/01

JAEA-Research-2021-012.pdf:7.23MB

A radiation shielding analysis was performed for the structure located above the spallation target of an accelerator-driven system (ADS), assuming one cycle of an 800 MW thermal and 30 MW beam power operation. In this analysis, the Monte Carlo particle transport code PHITS and the activation analysis code DCHAIN-PHITS were used. The structures to be analyzed are a beam duct above the target, a beam transport room located above the ADS reactor vessel, beam transport equipment, and the room ceiling. For each structure, the radiation doses and radioactivities during and after the operation were estimated. Furthermore, the shielding structure of the ceiling was determined. As a result, it was found that the radiation dose at the site boundary would be sufficiently lower than the legal limit by applying the determined shielding structure. Moreover, under the condition of this study, it was shown that the effective dose rate around the beam transport equipment positioned above the target after the operation exceeded 10 mSv/h, and that the maintenance and replacement of the equipment in the room would require remote handling.

2 (Records 1-2 displayed on this page)
  • 1